Belsize Park Tube Station began operations in 1907 for the Charing Cross, Euston & Hampstead Railway. The platform is 33.2 m (108 ft 10 in) from the surface, and can be reached by the emergency exit in 219 steps. Three lifts connect the platform to ground level.
Platform level, Belsize Park Station (GPS: 51.55044, -0.16437) Source: https://commons.wikimedia.org/wiki/File:Belsize_Park_stn_northbound_look_north.JPG Author: Sunil060902