MRT Kajang LineMRT Kajang Line (6 August, 2017)


MRT Kajang Line  Green Line  is the first of the three Kuala Lumpur MRT Lines to be constructed. Previously known as the Sungai Buloh-Kajang Line, it was launched by the Prime Minister Dato' Sri Najib Tun Razak on 8 July, 2011. The first of three lines to be implemented, the Sungai Buloh-Kajang Line will be 51 km in length, of which 9.5 km will be underground. Stations on the MRT Kajang Line are given station codes with the letters KG.

According to MRT Corp1, there will be 31 stations, of which 9 will be underground. Three more stations are being planned, and one is dropped. As of time of writing (April 2015), the line and stations are all under construction, so more details and updates will be carried out on this page.

Phase One of the MRT Kajang Line, covering the first 12 elevated stations, from Sungai Buloh MRT Station to Semantan MRT Station became operational on 16 December, 2016. Phase Two, covering the remaining 19 stations of the line, became operational on 17 July, 2017, and was officiated by prime minister Datuk Seri Najib Tun Razak. The date was deliberately choosing as 17.7.17 is a memorable number.

Ticketing

Users of the MRT can either pay for their rides with Single Journey Tokens or with Touch 'n Go Cards, which are available for purchase at all the MRT SBK Customer Service Offices. A minimum RM3 value requirment is applicable on all the Touch 'n Go cards, but users enjoy a discount on distant journeys.

Updates on the MRT Kajang Line

18 July, 2017: The prime minister Datuk Seri Najib Tun Razak officiated the opening of the MRT Kajang Line, said to be the newest and most modern in the world. All 31 stations have become operational.

16 December, 2016: Phase One of the MRT Kajang Line became operational between the Sungai Buloh and Semantan MRT Stations. During the trial run, the public will get to use the service for free. Fares will only be implemented from 17 January, 2017. Phase One of the line was completed at a cost of RM21billion, which is RM2 billion below the projected cost. Phase Two is expected to go into operations in July 2017.

Sungai Buloh MRT Station

Sungai Buloh MRT Station

Details
Kampung Selamat MRT Station

Kampung Selamat MRT Station

Details
Kwasa Damansara MRT Station

Kwasa Damansara MRT Station

Details
Kwasa Sentral MRT Station

Kwasa Sentral MRT Station

Details
Kota Damansara MRT Station

Kota Damansara MRT Station

Details
Surian MRT Station

Surian MRT Station

Details
Mutiara Damansara MRT Station

Mutiara Damansara MRT Station

Details
Bandar Utama MRT Station

Bandar Utama MRT Station

Details
Taman Tun Dr Ismail MRT Station

Taman Tun Dr Ismail MRT Station

Details
Phileo Damansara MRT Station

Phileo Damansara MRT Station

Details
Pusat Bandar Damansara MRT Station

Pusat Bandar Damansara MRT Station

Details
Semantan MRT Station

Semantan MRT Station

Details
Muzium Negara MRT Station

Muzium Negara MRT Station

Details
Pasar Seni MRT Station

Pasar Seni MRT Station

Details
Merdeka MRT Station

Merdeka MRT Station

Details
Bukit Bintang MRT Station

Bukit Bintang MRT Station

Details
Tun Razak Exchange MRT Station

Tun Razak Exchange MRT Station

Details
Cochrane MRT Station

Cochrane MRT Station

Details
Maluri MRT Station

Maluri MRT Station

Details
Taman Pertama MRT Station, Kuala Lumpur

Taman Pertama MRT Station

Details
Taman Midah MRT Station

Taman Midah MRT Station

Details
Taman Mutiara MRT Station

Taman Mutiara MRT Station

Details
Taman Connaught MRT Station

Taman Connaught MRT Station

Details
Taman Suntex MRT Station

Taman Suntex MRT Station

Details
Sri Raya MRT Station

Sri Raya MRT Station

Details
Bandar Tun Hussein Onn MRT Station

Bandar Tun Hussein Onn MRT Station

Details
Batu Sebelas Cheras MRT Station

Batu Sebelas Cheras MRT Station

Details
Bukit Dukung MRT Station

Bukit Dukung MRT Station

Details
Sungai Jernih MRT Station

Sungai Jernih MRT Station

Details
Stadium Kajang MRT Station

Stadium Kajang MRT Station

Details
Kajang MRT Station

Kajang MRT Station

Details

The initial line of the Kuala Lumpur MRT is expected to cost RM36 billion. The construction is expected to start in July 2011, however the figure has since been revised to RM36 billion (as of April 2015). When completed, the first line of the MRT is expected to serve 1.2 million commuters in the vicinity of the line. Presently the first MRT line in Kuala Lumpur is expected to go into operations in 2017.

Map of Klang Valley's Mass Transit Lines

References

Return to Kuala Lumpur MRT, Malaysia Rail Transportation Network

Rapid Transit Lines

 Latest updates on Penang Travel Tips

 Discover with Timothy YouTube Channel

 PG Food Channel

 Learn Penang Hokkien YouTube Channel

SojiMart Videos

Latest from Discover with Timothy: Gurney Bay - what to see and do there

About this website



Hello and thanks for reading this page. My name is Timothy and my hobby is in describing places so that I can share the information with the general public. My website has become the go to site for a lot of people including students, teachers, journalists, etc. whenever they seek information on places, particularly those in Malaysia and Singapore. I have been doing this since 5 January 2003, for over twenty years already. You can read about me at Discover Timothy. By now I have compiled information on thousands of places, mostly in Peninsular Malaysia and Singapore, and I continue to add more almost every day. My goal is to describe every street in every town in Malaysia and Singapore.

Robbie's Roadmap

Copyright © 2003-2024 Timothy Tye. All Rights Reserved.